New law being reviewed in Indiana on outdoor stages.
Passed the senate there and new law will be requiring engineers to sign off, like the building inspections.
This will require more time for the approval process for running shows.
What will this do for the small local people having shows outside venues behind the local bar. Updating their pole shed covers and getting the bands small lighting truss approved.
If our 7 to 1 weight approval on rigging is not good enough than the 10 to 1 used in Europe also saw a catastrophic failure last year also. Should an engineer be planning for 20 to 1?