Mal Brown

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1340
rigging
« on: February 06, 2020, 02:30:50 PM »

One of the outdoor venues I work is  installing a roof.  Haven't seen the drawings or plans.  The architect tells me at he'll have pipe across the top front for lighting fixture attachment.  Supposedly 500 lbs load per point.

So I want to hoist say 9m F33 Global truss with 8 or so fixtures.  A mix of led pars and Mid sized movers.  Call it 150 lbs on the high side after power disto.

from a work flow standpoint, I would like to work on lights at chest height and dhoist the assembled truss and fixtures into place.  I would also install the hoists in position and secure them place in a theft proof manner at the start of the weekly series in August and put them out in Sept.  This is a public space with no security.

so, I'll need 2 hoists, chain buckets and and the security locking arrangements.  I am visiting pole an hook gizmo to retrieve / store the chain week to week.

Is a safety factor of 10, meaning 1500 lbs appropriate  or over kill ?
Any preferred vendors for this part  stuff ?
any recommendations on the locking aspect ?

Thanks!
Logged
Bass player, sound guy.
FB Gorge Sound and Light
FB Willyand Nelson
FB SideShow

Scott Holtzman

  • Hero Member
  • *****
  • Online Online
  • Posts: 7557
  • Ghost AV - Avon Lake, OH
    • Ghost Audio Visual Systems, LLC
Re: rigging
« Reply #1 on: February 06, 2020, 09:31:16 PM »

One of the outdoor venues I work is  installing a roof.  Haven't seen the drawings or plans.  The architect tells me at he'll have pipe across the top front for lighting fixture attachment.  Supposedly 500 lbs load per point.

So I want to hoist say 9m F33 Global truss with 8 or so fixtures.  A mix of led pars and Mid sized movers.  Call it 150 lbs on the high side after power disto.

from a work flow standpoint, I would like to work on lights at chest height and dhoist the assembled truss and fixtures into place.  I would also install the hoists in position and secure them place in a theft proof manner at the start of the weekly series in August and put them out in Sept.  This is a public space with no security.

so, I'll need 2 hoists, chain buckets and and the security locking arrangements.  I am visiting pole an hook gizmo to retrieve / store the chain week to week.

Is a safety factor of 10, meaning 1500 lbs appropriate  or over kill ?
Any preferred vendors for this part  stuff ?
any recommendations on the locking aspect ?

Thanks!


Not sure what you mean pole and hook gizmo.  You could just use a chain fall to save money.  CM Lodestar is the leader in this space.  There are other brands but you want the CM.  With just two lift points you can simply drop the pickle from the motor to lift, you can also get a motor controller if you wish.  They are available in single and three phase versions.





Logged
Scott AKA "Skyking" Holtzman

Ghost Audio Visual Solutions, LLC
Cleveland OH
www.ghostav.rocks

Tim McCulloch

  • SR Forums
  • Hero Member
  • *
  • Offline Offline
  • Posts: 23774
  • Wichita, Kansas USA
Re: rigging
« Reply #2 on: February 06, 2020, 11:33:12 PM »


Not sure what you mean pole and hook gizmo.  You could just use a chain fall to save money.  CM Lodestar is the leader in this space.  There are other brands but you want the CM.  With just two lift points you can simply drop the pickle from the motor to lift, you can also get a motor controller if you wish.  They are available in single and three phase versions.
I think he's talking about manual chain hoists and using the hook on a pole to put the chain up in a bag and to retrieve it, rather than using a lift or tall ladder.
Logged
"If you're passing on your way, from Palm Springs to L.A., Give a wave to good ol' Dave, Say hello to progress and goodbye to the Moonlight Motor Inn." - Steve Spurgin, Moonlight Motor Inn

Mal Brown

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1340
Re: rigging
« Reply #3 on: February 07, 2020, 01:05:08 AM »

yep.  That has been my plan. 
Logged
Bass player, sound guy.
FB Gorge Sound and Light
FB Willyand Nelson
FB SideShow

Mark Cadwallader

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1338
  • Helena, Montana USA
Re: rigging
« Reply #4 on: February 07, 2020, 01:54:14 AM »

For security and safety, GAC back-up with a proper shackle (for strength) and a lock throught the eyes would probably do it. You will need a ladder or a lift for the initial focus anyway. (I can't imagine trying to fix bounce focusing with manual chain falls. Ick.). You could strike the chain hoists and just let the truss be deadhung, too. 
Logged
"Good tools are expensive, but cheap tools are damned expensive."

Tim McCulloch

  • SR Forums
  • Hero Member
  • *
  • Offline Offline
  • Posts: 23774
  • Wichita, Kansas USA
Re: rigging
« Reply #5 on: February 07, 2020, 03:16:19 AM »

I would leave NOTHING outside.  For security (if you can get the chain down, so can a thief) and weather protection (does the wind blow when it rains, even a little?).  At the very least some meth head will come by and cut down wiring for scrap copper sale.

A new-ish outdoor venue here has 24/7 surveillance and they've watched various "rough camping" people try to steal chairs, stools, an extension cord left on the stage, and I think they tried to take a picnic table.  No production equipment is left out unless there is a security guard on the stage overnight and even then I wouldn't want my shop's stuff out.

How much labor must be saved to replace the gear you fly?
Logged
"If you're passing on your way, from Palm Springs to L.A., Give a wave to good ol' Dave, Say hello to progress and goodbye to the Moonlight Motor Inn." - Steve Spurgin, Moonlight Motor Inn

Helge A Bentsen

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1777
  • Oslo, Norway.
Re: rigging
« Reply #6 on: February 07, 2020, 05:15:21 AM »

Get yourself some prerig dollies and electric chain motors.
Prerig everything and roll it out of the truck, assemble on site and hoist it up in the air.

Easy and safer than having equipment outdoors for weeks.
Logged

Taylor Hall

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 869
Re: rigging
« Reply #7 on: February 07, 2020, 08:39:18 AM »

Get yourself some prerig dollies and electric chain motors.
Prerig everything and roll it out of the truck, assemble on site and hoist it up in the air.

Easy and safer than having equipment outdoors for weeks.
This. We made up a similar lighting rig for a series of 'screen on the green' events that also included a live band in the hours leading up to full darkness. It was a trivial matter to roll everything in and out, and easily saved us an hour of setup time.
Logged
There are two ways to do anything:
1) Do it right
2) Do it over until you do it right

Dave Pluke

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1789
  • Northwest GA, USA
    • BIGG GRIN Productions
Re: rigging
« Reply #8 on: February 07, 2020, 09:43:41 AM »

from a work flow standpoint, I would like to work on lights at chest height and dhoist the assembled truss and fixtures into place.  I would also install the hoists in position and secure them place in a theft proof manner at the start of the weekly series in August and put them out in Sept.  This is a public space with no security.

Plenty of good thoughts so far.  Are you using IP65 fixtures or risking rain damage?

What is the trim height of the proposed truss and could it be accessed by scissors lift for focusing?  If it were my rig, and assuming the truss would not be reachable once flown, I would either disconnect all cabling or tuck it up into the truss at the end of each show.

Dave
Logged
...an analog man in a digital world [tm]

Flying direct to nearly everywhere out of ATL

Mal Brown

  • Hero Member
  • *****
  • Offline Offline
  • Posts: 1340
Re: rigging
« Reply #9 on: February 07, 2020, 10:42:41 AM »

13 to 15 feet.  only the hoists would be left in my initial thoughts. I'm hoping for ip65 on a limited selection of fixtures by the onset of the series. The rest would be undercover.

My truss is pre rigged wiring and signal wise.  currently, we bring it out, assemble it to length.  get it up on duratruss stands and attach fixtures.  Test and crank it up.   I was envisioning something similar with this except chain hoists, not stands.

I think what I'm reading says we are going up the ladder each event regardless.  Backup safety chain...  The ladder trips were a part of what I was trying to avoid.  I see each of those as a risk...

Now that I am a knee biter I'm beginning to wonder if I should have stayed an ankle biter ;-)
Logged
Bass player, sound guy.
FB Gorge Sound and Light
FB Willyand Nelson
FB SideShow

ProSoundWeb Community

Re: rigging
« Reply #9 on: February 07, 2020, 10:42:41 AM »


Pages: [1] 2  All   Go Up
 



Site Hosted By Ashdown Technologies, Inc.

Page created in 0.046 seconds with 23 queries.