Do you - Include Quantity, Description , Manufacturer, Model # and simply leave out the price
Yes, and I only include major items. If there is equipment that requires something like plug-in mods I will give the Description , Manufacturer, Model # and just say "configured for _________ rather than go into the details.
Our proposals are arranged first with a description of the system, then an equipment list then a description of the installation. The installation section is prefaced with:
"Installation includes all labor, permits, inspections and all other material and equipment not specified above which is necessary for a complete and working system as specified. A description follows:".
-Hal